Metal Recycling Customer Cases

Review practical equipment configurations, operating challenges and project outcomes from real processing scenarios.

Published Customer Cases

Latest Applications from Our CMS

Application cases published by the Deshang team. Customer identity may be withheld while the processing challenge and equipment approach remain clear.

CASE 01HBT Side Push-Out Metal Baler Workshop Trial

Metal Baler Commissioning

HBT Metal Baler Workshop Trial

Workshop trial of an HBT side push-out baler with conveyor feeding and formed scrap bales.

View Case
CASE 02315-Ton Side Push-Out Metal Baler in Saudi Arabia

Saudi Arabia Metal Baler Project

315-Ton Side Push-Out Metal Baler

Side-discharge baling aligned with a hot-climate scrap yard and its adjacent forklift aisle.

View Case
CASE 03200-Ton Front-Discharge Stainless Scrap Baler in Germany

Germany Metal Baler Project

200-Ton Stainless Scrap Baler

Front discharge connects stainless scrap baling with weighing and batch identification.

View Case
CASE 04160-Ton Turn-Out Metal Baler in Thailand

Thailand Metal Baler Project

160-Ton Turn-Out Metal Baler

A flexible turn-out baler for changing batches of light and mixed metal scrap.

View Case
CASE 05250-Ton Side Push-Out Stamping Scrap Baler in Mexico

Mexico Metal Baler Project

250-Ton Stamping Scrap Baler

Side discharge links stamping-scrap compaction directly to the existing forklift aisle.

View Case
CASE 06125-Ton Turn-Out Scrap Baler in South Africa

South Africa Metal Baler Project

125-Ton Turn-Out Scrap Baler

A compact turn-out baler for mixed scrap and limited recycling-yard space.

View Case

Case Review Method

What We Confirm Before Recommending Equipment

A useful case comparison begins with operating conditions, not just a machine model.

01

Material Profile

Type, size, bulk density, contamination, oil content and feeding behavior.

02

Capacity Target

Hourly throughput, shifts, storage rhythm and downstream demand.

03

Site Conditions

Available footprint, power, lifting equipment, access and maintenance space.

04

Process Connection

Upstream feeding, discharge, conveying, collection and control requirements.

Share your material and site information for a comparable application review.

Discuss Your Project →