
Large Screw-Feed Hopper
Buffer loose chips and coordinate screw feeding with the briquetting press.
Read technical guideRequirement review, installation guidance, commissioning, maintenance planning and after-sales technical support.
Equipment Technical Guides
Practical guidance on chip feeding, fluid separation, conveying, cart handling and hydraulic oil cooling.

Buffer loose chips and coordinate screw feeding with the briquetting press.
Read technical guide
Separate attached oil or coolant and plan the chip and fluid recovery path.
Read technical guide
Connect collection, storage and processing with controlled material transfer.
Read technical guide
Match a collection cart, lifting system and receiving hopper as one process.
Read technical guide
Review hydraulic heat load, oil flow and temperature-control requirements.
Read technical guideBefore Delivery
Early coordination helps reduce installation delays and makes commissioning more predictable.
Maintenance Support
For technical support, provide the equipment identification, operating conditions and clear evidence of the issue.
Use the manual for the supplied machine and its actual operating duty. Plan checks for guards and safety devices, hydraulic oil and filters, hoses and seals, fasteners, lubrication points, feeding and discharge mechanisms, and unusual noise or temperature. Wear depends on material, contamination and operating hours, so do not apply one fixed service interval to every model. Keep inspection and service records to support fault diagnosis.
Stop and assess abnormal operation according to the machine manual and site safety procedure. Trained personnel must isolate the relevant energy sources before access, cleaning or inspection. Record alarms, material changes, feeding behavior, cycle times and temperature trends, then compare them with the agreed operating conditions. Do not bypass guards, repeatedly force a blockage or increase pressure to compensate without authorized technical guidance.
Use the machine model, serial or nameplate information, drawings and the actual installed component details. Review likely wear in the cutting, pressing, feeding and hydraulic systems against the material and operating duty. Confirm part compatibility, inspection criteria and any replacement procedure with the supplier. The recommended stock and replenishment plan depend on component criticality and the project’s supply arrangements, not a universal parts list.
Provide the machine identification, commissioning date, alarm text, clear photos or video, recent operating or maintenance changes, material details and actions already taken. Include when the issue occurs and whether the machine has been safely stopped. Remote diagnosis is appropriate only where safe checks can be performed by qualified site personnel. On-site attendance, response timing, training and parts supply depend on the agreed service scope.