01 / PRODUCT DESCRIPTION
Product Overview
Purpose, machine structure and its role in the recycling process.
Specify the site supply, not only the frequency
The Front-Out HBQ Metal Baler for 50 Hz Three-Phase Supply is for buyers who need the electrical configuration aligned with an existing installation. The supplied HBQ information lists three-phase power, frequency alternatives of 50 Hz or 60 Hz, and a series voltage range. Those entries are reference choices, not a statement that every machine can be connected to every listed supply.
Provide the actual site voltage and frequency, the available electrical documentation and the intended installation location. Have the supplier identify the quoted configuration in writing. For this purchase path the intended frequency is 50 Hz; a future change to another supply requires a fresh technical review rather than an assumption that relabeling or simple adjustment is sufficient.
02 / MATERIALS & OUTPUT
Applications & Materials
Suitable scrap materials, industries and operating scenarios.
Electrical selection follows the real processing duty
Describe the reviewed light steel or nonferrous scrap to be processed, including dimensions, thickness, shape and preparation. Supply information about loading, expected work pattern and the way bales will be collected. These details help the supplier select the overall machine and its electrical requirements. Choosing a frequency does not determine the acceptable scrap, motor rating or hydraulic output by itself.
Keep material sorting and feed limits explicit. Long pieces, dense sections and contamination need assessment; sealed containers, hot scrap and hazardous residues must not be treated as ordinary approved input. The site should also identify environmental conditions around the equipment, such as dust, ambient conditions and access for inspection, without assuming an enclosure or cooling rating that has not been specified.
Use the HBQ series overview to discuss the loading and forward-discharge arrangement. The electrical package should match that complete configuration, not a generic model name alone.
03 / STRUCTURE & FEATURES
Equipment features.
Features & Benefits
Operational advantages and configuration benefits for buyers.
A clear electrical schedule prevents ambiguous comparisons
Request a schedule identifying the motor and control supply requirements, the chosen components and the documents needed by the site's qualified electrical personnel. The manufacturer's requirements and local rules should guide cable, protective-device, earthing and isolation decisions. This page does not provide installation sizes or tell an unqualified person how to connect industrial equipment.
Clarifying the supply at quotation stage helps buyers compare offers on the same basis. A series power range is not a connected-load calculation for the proposed machine, and different cooling or auxiliary options can change what must be considered. Confirm which items are included in the electrical scope and which are separate site services.
The listed 50 Hz and 60 Hz alternatives are useful for specifying machines for different locations, but frequency alone is not a sufficient reason to claim two otherwise identical machines perform differently. Do not infer speed, cycle time or throughput from the frequency entry. Ask for the performance conditions applicable to the quoted model and representative material.
Documenting the final nameplate and drawing revision also makes later service discussions clearer. If the machine is moved, compare the new installation against those records before use. A voltage range shown in general sales information is not permission to reconnect equipment without technical confirmation.
04 / WORKING PRINCIPLE
Operation & Maintenance
Practical guidance for safe operation and routine maintenance.
Review installation and commissioning responsibilities
Before shipment, agree which drawings, component information and commissioning instructions will accompany the machine. Provide the supplier with the site's confirmed supply information and identify who will review the electrical interface. Include the loading zone, service space and forward bale collection route in the same site plan so the equipment is not selected around electricity alone.
At delivery, have authorized personnel compare the machine identification and documentation with the order. Commissioning should follow the supplier's procedure and applicable local requirements. Any checks of connections, protective arrangements or machine operation belong to competent personnel using approved methods; do not improvise live tests.
During operation, follow the prescribed inspection and isolation instructions, report abnormal conditions and avoid unauthorized component substitutions. A control change or added auxiliary load should be reviewed against the original design. Keep maintenance records and the final electrical documentation accessible to the people responsible for the installation.
05 / TECHNICAL REFERENCE
Technical Parameters
Key selection data and model-dependent specification ranges.
Confirm the selected configuration
The six attributes below come from the supplied HBQ series information. A series range or listed option is not proof that one machine covers every value or includes every alternative. Confirm the exact model, approved scrap, supply, loading method and discharge arrangement in the written specification. Mechanical attributes are fixed for this page after publication, but the order still needs a configuration review.
Front-Out Baler Reference Video is the user-designated equipment and process reference. It is not a test report for every material, configuration or performance figure discussed here.
| Attribute | Reference value |
|---|---|
| Series supply voltage range | 220–660 V; select the ordered supply configuration |
| Series oil tank volume | 800–3,000 L; confirm selected model |
| Discharge direction | Forward push-out |
| Core components | Pump and motor |
| Baler arrangement | 3 rams |
| Steel plate reference | Q235B, according to specified construction |
07 / QUESTIONS & SUPPORT
Product questions,
answered.
Delivery, Service & FAQ
Delivery scope, technical support and frequently asked questions.
Frequently asked questions
Does 50 Hz determine the supply voltage?
No. Confirm the actual voltage, three-phase arrangement and other installation requirements separately with the supplier and qualified site personnel.
Can the same machine be connected to 60 Hz later?
Do not assume it can. The source lists frequency alternatives, not universal compatibility. A change of supply needs a technical review of the specific machine.
Is every model in the voltage range interchangeable?
No. The series range describes available configurations. The delivered machine must match its nameplate, documentation and approved installation.
Does frequency establish production capacity?
No. Material, preparation, model and operating conditions determine the relevant assessment. Review the HBQ configuration rather than deriving output from frequency.
Who chooses cables and electrical protection?
Qualified personnel must use the manufacturer requirements and applicable local rules. This product description is not an electrical installation instruction.
Which documents should be retained?
Keep the final electrical drawings, nameplate details, ordered options and commissioning record alongside the control-operation documentation.
Equipment Recommendation
Tell Us About Your Material and Capacity
Share the key operating conditions below so our team can compare suitable equipment and prepare a practical configuration.