Metal Balers

Hydraulic Metal Recycling Baler with Dual Main Cylinders

HBK hydraulic baling assessed through material and configuration requirements

Hydraulic Metal Recycling Baler with Dual Main Cylinders from the HBK family, with horizontal hydraulic compression and grab-out collection for assessed, prepared steel sheet and plate offcuts.

HBK familyTwin main cylindersHydraulic compressionGrab-out bale handling
Suitable materials

PRODUCT VIDEO

Hydraulic Metal Recycling Baler with Dual Main Cylinders video

01 / PRODUCT DESCRIPTION

Hydraulic Configuration and Project Interfaces with HBK

Define the application before choosing a machine specification.

Hydraulic Configuration and Project Interfaces with HBK

HBK family guidance for prepared steel sheet and plate offcuts. Confirm the selected machine and application before ordering.

The Hydraulic Metal Recycling Baler with Dual Main Cylinders belongs to the HBK horizontal baler family. It combines hydraulic compression with a twin-main-cylinder arrangement and grab-out bale collection. This page focuses on the configuration information needed for prepared steel sheet and plate offcuts. Dual and twin refer to the same main-cylinder count here; this wording does not describe a newly differentiated machine or an independently rated recycling model.

Define the duty before selecting the configuration. Provide the material description, planned operating schedule and available site services, then review the proposed hydraulic, electrical and handling interfaces together. Component names and general layout descriptions are useful discussion points, but the final technical proposal should identify the equipment actually offered and the site provisions it requires.


02 / MATERIALS & OUTPUT

Prepared Steel Sheet and Plate Offcuts

Describe representative material and preparation requirements.

Hydraulic selection begins with the scrap presented to the chamber. Record steel grade, actual thickness, maximum dimensions, shape and contamination for the prepared offcuts. Describe how material accumulates and whether charges vary significantly during the day. Do not use the thickness of the baler’s construction steel as an allowable thickness for processed scrap.

Show both typical pieces and the largest or most awkward pieces that routinely occur. Explain any sorting or size preparation intended before loading, and have the acceptable material envelope confirmed for the selected machine. The assessment on this page is limited to prepared sheet and plate offcuts; the generic metal recycling title does not authorize unrelated materials or unrestricted heavy scrap.


Loose thin strip and sheet-metal offcuts
Steel-sheet material reference. Confirm grade, thickness, dimensions and preparation for the selected HBK configuration; not a matched HBK production trial.
Formed sheet-metal stamping remnants
Steel-sheet material reference. Confirm grade, thickness, dimensions and preparation for the selected HBK configuration; not a matched HBK production trial.
Perforated sheet skeletons and trim
Steel-sheet material reference. Confirm grade, thickness, dimensions and preparation for the selected HBK configuration; not a matched HBK production trial.
Loose bent sheet and strip remnants
Steel-sheet material reference. Confirm grade, thickness, dimensions and preparation for the selected HBK configuration; not a matched HBK production trial.

03 / STRUCTURE & FEATURES

Equipment features.

HBK-family hydraulic metal baler with twin main cylinders; equipment reference

Compression, Controls and Handling Interfaces

Review series features against the selected supply scope.

Horizontal hydraulic layout: HBK combines a charging chamber with twin-main-cylinder compression and grab-out bale collection. Confirm the final hydraulic sequence in the selected machine documentation.

Control selection: the series source lists PLC automatic or manual control. Optional remote control requires explicit confirmation in the supply scope.

Wear components: the source identifies interchangeable wear steel plates and NM450 or Hardox450 alternatives. Confirm the selected material and replacement details in the proposal.

Handling interfaces: specify approved loading and bale collection equipment, operating clearances and protected work areas. A grab-out designation does not establish an included crane.

Review guards, interlocks, emergency stops and maintenance access with the final configuration. Product illustrations and a series-level feature list do not replace machine-specific operating instructions or installation documentation.


04 / WORKING PRINCIPLE

Approved Loading and Baling Sequence

Coordinate safe preparation, compression and bale collection.

  1. Prepare: sort approved offcuts, check dimensions and exclude batteries, sealed or pressurized containers and hazardous contamination.

  2. Load: use the approved feeding method with personnel outside the operating zone.

  3. Compress: operate the documented hydraulic sequence under the selected control arrangement.

  4. Collect: remove the bale using suitable grab-out handling equipment and the designated route.

  5. Reset: complete the prescribed checks before the next charge.

Only trained personnel should operate the equipment. Follow the machine manual and site isolation procedures for inspection, clearing obstructions or maintenance, including stored hydraulic energy. Never reach into the chamber or attempt to reposition material during operation.


05 / TECHNICAL REFERENCE

HBK Series Parameters and Selection

Selected attributes require a model-specific technical proposal.

The table presents selected HBK series attributes, not a complete model specification. Confirm the final combination, material limits, chamber dimensions, force, power and bale requirements in the technical proposal. Numerical output and bale properties require defined feedstock and operating conditions.

Mechanical attributeHBK series reference / option
Construction steelQ235B; machine construction steel
Motor voltageCustomized; confirm site supply and selected model
Control optionsPLC automatic or manual control, according to configuration
Remote controlOptional
Bale shape referenceSquare / cube; confirm selected dimensions
Wear-plate material optionsNM450 or Hardox450, according to configuration


07 / QUESTIONS & SUPPORT

Product questions,
answered.

HBK Project Questions

Six practical answers for material and procurement review.

Which electrical information should be provided?

State the available supply and any installation constraints for the project review. The source describes customized motor voltage, so a specific supply should not be assumed from the title. Confirm the selected electrical requirements and responsibility for site connections in the technical proposal.

Are hydraulic force and motor power fixed for this title?

No. HBK is a product family, and this title does not map to one verified numerical specification. Describe actual material and operating duty using the quotation checklist. Confirm the selected model’s values in the proposal rather than combining unrelated series-level ranges.

Is remote operation supplied as standard?

The source lists remote control as optional, while PLC automatic and manual control are alternatives according to configuration. Confirm what is offered, how it interfaces with loading and collection, and which operating instructions apply. Do not infer included accessories from equipment photographs.

What should be checked around hydraulic service access?

Include access to specified components in the layout review and follow the selected machine’s maintenance documentation. Inspection, servicing and blockage removal must use the required isolation and stored-energy procedures. Qualified personnel should resolve abnormal conditions before the equipment returns to operation.

Can hydraulic cycle time be used as shift output?

Use a complete operating assessment that includes loading and grab-out collection as well as compression. The production planning guide explains the difference. Material variation and shared handling equipment should be included in agreed test conditions before a shift quantity becomes a planning assumption.

How can the proposed configuration be reviewed?

Send a material description, photos, operating schedule, site layout and electrical information, then contact Dershan. Ask for a clear list of supplied equipment, available options and site responsibilities. Review these interfaces with the intended loading and bale collection methods before finalizing the project.


Equipment Recommendation

Tell Us About Your Material and Capacity

Share the key operating conditions below so our team can compare suitable equipment and prepare a practical configuration.

✓ Material & Capacity Review✓ Configuration Recommendation✓ Pricing & Lead-Time Inquiry

We use this information only to respond to your equipment inquiry.